A Bit of a Slip Up…….

I have been continuing with the wiring of Glenmutchkin, but have hit a snag; one that I should have been ready for – the wiring of the slip,  I had been aware that a diamond crossing was a challenge to wire and I was suckered into thinking that the switches on a slip could over come the challenge,  Well I go that wrong…….!!

The basic problem is that there are a choice of two routes through a diamond crossing and each route requires the polarity of the crossings to be different.  The diagram below, which shows how a diamond crossing needs to be wired, should illustrate the problem.  The only solution to this is to power the crossing polarity by way of an approach turnout – if you really don’t have one to set the polarity with, then you are going to have to resort to some switches – but at least it will give you a good excuse to interlock the diamond crossing with some signals to remind you on which direction it is set!

Crossing Wiring

Hopefully this is clear that the crossings on the diamond crossing are activated by detecting the direction of the switch on the approach turnout.  If it is set for straight ahead, then a train can’t travel over the crossing and therefore the parallel line can so the polarity of the crossings are set accordingly.  Conversely, when the approach turnout is set to the branch, the line across the diamond can be used and the polarity is set to suit.

The principal with the diamond crossing needs to be heeded when the crossing is replaced with a single slip as I have, but it does get more complicated because the switch of the slip can also lead to a different route through the crossings.  The crossing to the left of the slip is the more straight forward as it is only activated by the approach turnout.  However the right hand crossing is more complicated as if the approach turnout is set for the branch then it always needs to be in the red polarity whereas if the approach turnout is set for the main, then it then needs to be controlled by the slips switch.

Slip Wiring v2

Hopefully the diagram above shows how this works.

The irritation I have, in addition to having wired it up wrong already (!) is that the approach turnout is on a different board to the slip.  To reduce the number of wires crossing the boards, I have decided to simply use a duplicate point motor for the approach turnout located on the same board as the slip.  It is expensive but rather more simple than the additional wires.

NB – please see also a follow up post on this wiring arrangement for an alternative approach.

 

Advertisement

About highlandmiscellany

Just playing trains; my weekday life is a bit more serious though!

Posted on October 8, 2017, in Glenmutchkin and tagged , , , , , , . Bookmark the permalink. 1 Comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

North Devon Clay

Launceston & District MRC

The Website of Dr. David Turner

Railways, transport and brewing historian

Eastsidepilot

Building models to 7mm/ft (1:43.5 scale)

Big Stacks Little Locomotives

A Lifetime of Model Railroading the 1870s and 1880s.

Roger Farnworth

A great WordPress.com site

Enterprising Limpsfield @ The Bull

a community hub in the heart of Limpsfield

Staffordshire Finescale

railway modelling group

MrDan's Model Musings.

Model railroad, prototype, historical and other random musings.

Edinburgh Princes Street

An interpretation of the passenger facilities of the former Edinburgh Princes St railway station

Dominion & New England Railway

Building an achievable transistion era O scale layout

A Model Meander

[mee-an-der] noun: a circuitous movement or journey.

Yeovil Model Railway Group (YMRG)

Making The Biggest Layouts That Will Fit In Our Huge Clubroom - since 1974

Central Vermont Railway

MODELLING MUSINGS ON PORTCHULLIN, GLENMUTCHKIN AND ANYTHING ELSE THAT TAKES MY FANCY

Chris Nevard Model Railways Blog

MODELLING MUSINGS ON PORTCHULLIN, GLENMUTCHKIN AND ANYTHING ELSE THAT TAKES MY FANCY

A Model Railway - Life in Miniature

MODELLING MUSINGS ON PORTCHULLIN, GLENMUTCHKIN AND ANYTHING ELSE THAT TAKES MY FANCY

Michael's Model Railways

MODELLING MUSINGS ON PORTCHULLIN, GLENMUTCHKIN AND ANYTHING ELSE THAT TAKES MY FANCY

Two Bolt Chair

4mm finescale modelling, slowly

Model Railway Musings by D827 Kelly

Model railway planning, design, building and other things related

Pembroke:87

Modelling the Canada Atlantic Railway in Pembroke in Proto:87

southpelawjunction.co.uk/wp/

- A HISTORY OF THE TYNE DOCK TO CONSETT RAILWAY -

Liverpool Range

Modelling a small section of the New South Wales Railways between Kankool and Pangela

highland miscellany

MODELLING MUSINGS ON PORTCHULLIN, GLENMUTCHKIN AND ANYTHING ELSE THAT TAKES MY FANCY

Great Western Railway Review

Recording and reporting articles and items of interest relating to the Great Wwestern Railway of Brunel, Goocg, Churchward and Collett et al and to modelling it in 4mm and 7mm scales.

Matt's Railroad Blog

Minnesota themed model railroading

%d bloggers like this: